Skip to product information
1 from 5
TROY LEE DESIGNS

MTB helmet TROY LEE DESIGNS FLOWLINE ORBIT MIPS Black

The MTB Helmet TROY LEE DESIGNS FLOWLINE combines casual style with high performance. Behind its sober, elegant appearance lies the reliability of the protection and... Read more
Regular price 842,00 DKK
Regular price Sale price 842,00 DKK
View full details

Description

The MTB Helmet TROY LEE DESIGNS FLOWLINE combines casual style with high performance. Behind its sober, elegant appearance lies the reliability of the protection and comfort technologies developed by TROY LEE DESIGNS. Troy Lee Designsat an affordable price. Featuring the MIPS technologytechnology, it reduces rotational impact in the event of a fall, offering enhanced safety.

Backed by years of helmet design expertise, this model optimizes safety with advanced features, earning it a five-star safety rating from Virginia Tech. Perfectly adapted to practice Trail and All Mountainthe All Mountain range, it offers uncompromising protection while remaining discreet and functional.

SIZES HEAD SIZE
XS/S 53-56 cm
M/L 57-59 cm
XL/XXL 60-63 cm

Ref: 9320466678109

Informations techniques

Weight (Manufacturer) : 375g

Adjustable visor 3-Way without visc(3 position) ;
Mips® B32-Series, brain protection system against rotational impacts;
360° adjustable support system with 3-position rear height adjustment;
14 vents for maximum airflow;
Complete in-mold wrap-around construction;
EPS liner;
Trail MTB helmet ;
Side strap adjustment :
Classic buckle closure;
Certification: CPSC 1203, CE EN 1078, AS NZ 2063:2008*, E-bike certified NTA 8776 ;

Informations prix

*Recommended retail price February 2024